Product Detail :
|
Reconditioning of 2 No Bucket/dipper Assembly of 182m Beml Bucyrus Make Electric Rope Shovel, Mechanised Excavation. Loading, Transportation and Unloading of 5.00 Lakhs Tones of Iron One Fines From Dep-10/11a Fine Ore Stockpile to Fine Ore Dump Fod Through Nmdc Weight Bridge at An Average Lead Distance of 3.5 – 4.0 Kms (one Way Approx ). De-silting of Slime From Check Bunds From Downhill, Magazine Pump House & Gully Nallah Pick Up Weir Including Mise Works for Improving Water Supply at Dep-5 . Hiring of 1 No. Excavator of Poclain Ex-210 Or Equivalent on Hourly Basis at Fod Area. Dismanting of Old Type Ii/ds/217-296, 10 Blocks Quarters (iind Phase) at Biom Bacheli Complex.
|